Solar panel installation at
the Port of Middlesbrough

The project involved precision planning and seamless integration with existing infrastructure, ensuring maximum efficiency and long-term performance.

The Client: A V Dawson

A busy working Commercial Port located by the River Tees handling shipping freight logistics across a 40 hectares site.

The Challenge

Working at a height of 40 metres required careful planning and coordination with the customer. Specialist equipment was used to access the building roof including use of the customer’s largest site crane.

 

The Results

With this latest installation of 555 Solar panels, AV Dawson’s total solar capacity now stands at 895.13 kWp across all its sites, generating approximately 574 MWh of clean electricity every year.

This bespoke solution was designed to support AV Dawson’s specific operational requirements while advancing their sustainability objectives.

Related Case Studies